Power evacuation study of solar thermal power plants in the Spanish transport network

P. Frías

November 2018 - December 2018

Funding entity Invesyde S.L


The objective of the collaboration is to carry out a study to calculate the hosting capacity at the Villanueva del Rey substation, in the 220kV Spanish transmission network. Different scenarios of generation, demand and configuration of the transmission network will be studied.


INVESYDE-2018